Home About us Activities Consulting Sales Contact us عربي
 
 
Previous Work and Experience of AGECA Working Team 
1. Geological and geotechnical investigation of Mishraq electrical substation 132 kV site, 1989 (internal report).
2. Geological investigation of the subsurface cavities at Rawa bridge site, 1989 (internal report).
3. Using electrical resistivity method for locating subsurface weak zone at the water treatment building of Baji thermal power station, 1991-1993 (internal report, 5 volumes).
4. Geophysical investigation of the subsurface gravel layer at Al-Shemal thermal power site, 1993 (internal report).
5. The use of the water intake water at Al-Shemal thermal power site, 1994 (internal report).
6. Remarks on the submerged dike of Euphrates river at Al Anbar thermal power site, 1993 (internal report).
7. Pump Storage Project, Makhul/2, geological and geotechnical investigations, 1994 (internal report, 4 volumes).
8. A study for the Euphrates river at AL-Anbar thermal power site, 1993 (internal report).
9. Using the physical methods for extracting iron oxides of the iron ore, 1994 (internal report).
10. Hydrological study of the water intake location of the Rawa Pump Storage Power site, 1995 (internal report).  
11. Geophysical investigation of subsurface weak zones at Khor Al-Zubair Fertilizer Factory, 1996 (internal report, 3 volumes).12. Hydrological study of Al-Anbar Thermal Power Station, 1997 (internal report, 2 volumes).
13. Geophysical and hydrological study of groundwater problems at Al-Abbas shrine at Karblea city, 1998 (internal report).
14. The Hydrological study of the Middle Tigris reaches, Detailed Feasibility Study of Cascade dams, Commission of Electricity, Volume II, part 1,2001 (internal report, , 290p).
15. The hydrological study of the upper reaches of Euphrates River, Detailed Feasibility Study of Cascade Dams, Commission of Electricity, Volume II- part 2, 2001 ( internal report, 280p).
16. Brief description for the Cascade dams, pump storage stations and regulators, Commission of Electricity, Volume I, 2002 (210p).
17. Tigris River Middle Reaches environmental Studies, Detailed Feasibility Study of Cascade dams and related hydropower station, Commission of Electricity, Volume III, Part IV, 2002(180p).
18. Hydrological studies of Anbar T.P.S. water intake structure, 2002 (internal report, 2 volumes).
19. Detailed feasibility study of cascade dams, Ejbail Dam, Volume III, Part 2, 2002 ( internal report, four main parts and four main enclosures).
20. Detailed feasibility study of cascade dams, Al-Baghdadi Dam, Volume III, part 1, 2002 (internal report, four main parts and three main enclosures). 
21. Hydrological study at Al-Tahdi Project (Electric Power Station), 2003 (internal report, one volume).
22. Biological studies for the water intake of the Anbar TPS , 2003 (internal report, one volume).
23. Earth resistivity survey at Samarra power plant, 2004 (internal report,).
24. Shear wave velocities and elasto-dynamic properties of the soil, Al-Basrah Childern’s Hospital, 2004 (internal report,).
 
 Amak Geophysical Exploration (AGESA) Previous Works
25. Earth resistivity survey at Al-Talayee power sub station, 2004 (Report No. GPH4-2004, internal report).
26. Shear wave velocities and elasto-dynamic properties, Khur Al-Zubair Electro-power station, 2004 (Report No. GPH5-2004, internal report).
27. Earth Resistivity survey at Wordiya power sub station, 2004 (Report No. GPH6-2004, internal report).
28. Earth resistivity survey at Samarra power plant, 2005 (Report No. G1/2005, internal report).
29. Earth resistivity survey at Al-Taji power station, 2005 (Report No. G2/2005, internal report).
30. Earth resistivity survey at Al-Huriya power station, 2005 (Report No. G3/2005, internal report).
31. Earth resistivity survey at south Baghdad power plant-2, 2005(Report No. G5/2005, internal report).
32. Earth resistivity survey at AlThawra power sub station, 2005 (Report No. G6/2005, internal report).
33. Earth resistivity survey at Al-Karama power sub station, , 2005 (Report No. G7/2005, internal report).
34. Shear wave velocities and elasto-dynamic properties, Bazyan Cement Plant,  2005 (Report No. 1-S/2005, internal report).
35. Shear wave velocities and elasto-dynamic properties, Erbil Gas Power Station, Erbil, 2006 (Report No. G5/2006, internal report).
36. Detection of ground water level in Hawari Shar Park, Suliamanyia Park,  Suliamanyia, 2006 (Report No. G7/2006, internal report).
37. Earth resistivity survey at Sulamaniyah 132 substation, Amak Geophysical Exploration & Appliances Company, Suliamaniya, 2007.
38. Detail feasibility survey for Kirkuk –Suliamaniya Rail ways route.
39. Preliminary survey for Mosul - Hammam Al Alil railways route.                                                 
40. Shear wave velocities and elasto-dynamic properties, SOC Basrah
 oilfields, Amak Geophysical Exploration Company, Baghdad, 2009 (internal report).
41. Shear Wave Velocities &  Elasto-Dynamic Properties Al Rafdhia Oilfield Site (2009), internal report.
42. Shear Wave Velocities &  Elasto-Dynamic Properties Hammar-Meshrif Oilfield Site (2009), internal report.
43. Shear Wave Velocities &  Elasto-Dynamic Properties Hammar Oilfield Site (2009), internal report.
44. Shear Wave Velocities &  Elasto-Dynamic Properties Al Kahlaa Gas Power Station (2009), internal report.
45. Shear Wave Velocities &  Elasto-Dynamic Properties Missan New Refinery (150000 Barrel ⁄ day) (2009), internal report.
46. Shear Wave Velocities &  Elasto-Dynamic Properties Qader Karim Oil Field (2009), internal report.
47. Shear Wave Velocities &  Elasto-Dynamic Properties Zubair Oil Field (2009), internal report.
48. Down hole Seismic test  & Elasto-Dynamic Properties, Missan New Refinery (150000 Barrel ⁄ day) (2009), internal report.
 49. Surface Seismic Refraction Survey at Qader Karim Oil Field (2009), internal report.
 50. Surface Seismic Refraction Survey at  Zubair Oil Field (2009), internal report.
 51. Dawnhole Seismic Wave tests and Elasto-Dynamic Properties at Wassit TPS Project (2010) Rept. No. GPH12, February.
 52. Earth Resistivity Survey at Wassit TPS Project (2010) rept. No. GPH7, February.
 53. Gravity and Magnetic survey at Kifl area (2010), March.
 54. Shear Wave Velocities & Elasto-Dynamic Propertiesat Abu Ghrag Gas Station (2010) Rept. No. GPH7, May.
 55. Shear Wave Velocities & Elasto-Dynamic Propertiesat Baladiat Building (2010) Rept. No. GPH15, June.                                                 
56. Shear Wave Velocities & Elasto-Dynamic Propertiesat Doh Cement Factory project, Samwa (2010) Rept. No. GPH28, September.
 57. Shear Wave Velocities & Elasto-Dynamic properties at Al Shaaba Refinery site, Basrah (2010) Rept. No. GPH29, September.
 58. Earth Resistivity Survey at Nahrawn water Treatment Plant site(2010) Rept.DPH32, September.
 59. Shear Wave Velocities & Elasto-Dynamic Propertiesat Site – CPF1 (2010) Rept. No. GPH46, September.
 60. Shear Wave Velocities & Elasto-Dynamic Propertiesat Site – CAMP (2010) Rept. No. GPH52, September. 
 61. Shear Wave Velocities & Elasto-Dynamic Propertiesat Nassriya Refinery Project (2011) Rept. No. GPH1, January.
 62. 2D resistivity imaging at Technology University, Baghdad (2011) April.
 63. Cross hole Seismic wave tests and Elasto-Dynamic properties at Hammar DGAS Project (2011) Rept GPH6, April.
 64. Cross hole Seismic wave tests and Elasto-Dynamic properties at Hammar Mishrif DGAS Project (2011) Rept GPH5, April.
64. Cross hole Seismic wave tests and Elasto-Dynamic properties at Hammar DGAS Project (2011) Rept GPH6, April.  
65. Cross hole Seismic wave tests and Elasto-Dynamic properties at Zubair DGAS Project (2011) Rept GPH7, April.
66. Cross hole Seismic wave tests and Elasto-Dynamic properties at Zubair New Tank Farm- Rafidiya DGAS Project (2011) Rept GPH9, April.
67. Cross hole Seismic wave tests and Elasto-Dynamic properties at Zubair Mishrif DGAS Project (2011) Rept GPH4, March.
 68. Shear Wave Velocities & Elasto-Dynamic Propertiesat Erbil Project (2011) Rept. No. GPH21, June.
 69. Shear Wave Velocities & Elasto-Dynamic Propertiesat Luhais and Subba Oil Field (2011) Rept. No. GPH42, August.
70. Dawnhole Seismic Wave Tests and Elasto-Dynamic properties at Rumaila TPS Project (2011) Rept. No. 39, August.
71. Crosshole seismic wave tests and Elasto-Dynamic properties at West Qurna Oil project (2011) Rept No. 52, November.
72. Seismic Refraction survey at Bazirgan Oil field, Messan (2011) Report No. 53, November.                                                                          
73. Crosshole seismic wave tests and Elasto-Dynamic properties at Akaz Gas Power station project (2011) Rept No. 62, December.
74. GPR survey for detecting underground utilities at Baghdad University site (2011) Report No. 67, December.
75. Environmental survey of Dura Refinery, Baghdad, join venture with ALS- Malaysian (2011), July to December.
76. Foundation Inspection at Dar AlSalm buildings campus, Najaf by using geophysical methods (2012), report No. 5, February.
77 Khor Al Zubair NGL Power Plant generation, Phase I seismic refraction survey (2012), report No. 8, February.
78. Crosshole seismic wave tests and Elasto-Dynamic properties at West Gurna Gas Power station project (2012) Rept No. 9A, March
79. Seismic Refraction survey at West Qurna project (2012) Report No. 9B, March.
80. Seismic Refraction, Resistivity Survey and cross hole seismic tests at Badra project site (2012) report No. 10&11 , April.
81. Cross hole seismic test of Tuba Oil Tanks project, W. Qurna (2012) Report No. 12, April
82. Thermal Conductivity Survey at Badra Project site (2012) Report No. 15, April.
83. GPR Survey at Najebia Power Station, Basra (2012) Report No. 16, April.
 84. Cross hole seismic test and Seismic Refraction survey at Badra Oil Field, CPF(2012) Report No. 20, May.
85. Crosshole seismic wave tests and Elasto-Dynamic properties at Najebia Gas Power station project (2012) Rept No. 21, April.
86 Seismic Refraction, Resistivity, and Crosshole seismic tests at Shat Al Basra Gas Power  station project (2012), Report No. 24, 25 and 26, May.
87. Thermal conductivity survey at Shat AlBasra Gas Power station project (2012) Report No. 27, May
88. Seismic and resistivity survey at Bizrgan Oil field, Amara (2012), Report No. 29, May.
89. Environmental survey at Al Darua Refinery (2012), Report No.30, June.
90. Thermal Conductivity test at Badra Oil Filed, CPF (2012), Report No. 32, June
91. Seismic refraction survey at Erbil Gas Power station (2012) Report No. 33, June
92. Crosshole seismic tests at Erbil Gas power station (2012) Report No.34, June.
93 Shat Al Basra Gas Power plant project, cross hole tests and shear wave velocities properties (2012), Report No. 36, June.
94. Resistivity Survey at Daylah site (2012) Report No. 37, June                             
95. Resistivity Survey at Taji, Baghdad (2012) report No. 38, June.                                                                              
96. Seismic refraction Survey at Najaf cement factory proje ct (2012) report No. 42, August.
97. GPR survey at Hilla market for detecting water pipes (2012) report No. 44,September.
98. Seismic Refraction survey at Najaf Cement Factory project (2012), Report No. 54, September.
99. Down Hole tests at West Qurna I, CPF, DHT1 (2012), report No. 63, November.
100. Down hole test at West Qurna, Intake (2012), Report No. 67, Novmeber.
101 GPR survey at Fao seaport, Basra (2012) Report No.47 , October.
102. 2D & 3D Resistivity Imaging of Najaf Cement factory project site (2013), Report No. 001, January.
103. Thermal conductivity test of DS7 water injection site, W. qurna-1 (2013), Report No. 13, February.
104. Thermal Conductivity test of Borrow Pit Site, W. Qurna-1 (2013), Report No. 12, Feburary.
105. Down Hole seismic test at erbil, central park (2013), report No. 14, February.
106. Down Hole seismic test at West Qurna,- 1, ISBL, DS7 (2013), Report No. 21, February
107. Down hole seismic test at Zubai- Tuba (2013), report No. 22, March.
108. Cros Hole seismic test and shear wave velocities properties, West Qurna-2, CPF (2013), report No. 30, March.
109. GPR survey at FAO, Corridor Island site (2013), report No. 31. March.
110. Cross hole seismic test at Badra Project site (2013), Report No. 36, April.
111. Thermal Conductivity test at Badra, CPF, Phase II project (2013), report No. 39, April
112. Diwaniyah Electrical Power project Cross Hole test and shear wave properties (2013), Report No. 44, June.
113. Diwaniyah Electrical Power project thermal conductivity test (2013), Report No. 45, June.
114. Cross Hole seismic test of Al Shuiaba electric power project (2013), report 050, June.
115. Down Hole seismic test at West Qurna, -1, DHT1&2 (2013), Report No. 052, June.
116. Chamchmal Gas Power project cross hole test (2013), report No. 56. July.
117. Seismic Refraction survey of Chamchmal Gas Power project (2013), Report No.57, July.
 118. GPR survey of Al Shemal Thermal Power station (2013), Report No.60 , July.
 119. Down hole seismic test of Bazian 400KV sub station, Seliamani (2013), report No. 65, July.
 120. Down hole seismic test and elasto-dynamic properties of Dhok Power Plant site (2013), Report No. 066, August.
 121. Down Hole seismic test of Erbil Building, Erbil (2013), Report No. 070, August.
 122. Cross hole and Down hole seismic test of Makhmour Cement factory site, Erbil ( 2013), report No. 071, August.
 123. South Baghdad Power Station Seismic refraction and GPR survey (2013), report No. 073, September.
 124. Seismic refraction survey of Hartha Power Plant Station site (2013), Report No.  75, September.
 125. Thermal Conductivity test at Slemani, Kurdistan (2013), Report No. 81, October
126. Cross hole seismic tests and shear wave velocities properties, ANKA power plant site, W. Qurna (2013), report No.083, October.
127. Environmental Survey of Al Gharaf Oil Field, 2 Years Program, join venture with GESB, Malaysian company (2013 -2015)
128. GPR Survey of Basra Hotel, Basra (2013) Report No. 84, December.
129. Thermal Conductivity test at Dohuk, Kurdistan (2013), report No. 097, December.
130. Thermal Conductivity test at Selimani, underground electric cable (2014), Report No. 001, January.
131. Seismic refraction survey of Galala Cement Factory site, Samawa (2014), Report No. 5, January.
132. Cross hole seismic test and shear wave velocities properties of Dohuk Gas Power Station site (2014), Report No. 014, February.
133. Seismic Refraction survey of Dohuk Gas power station site (2014), Report No. 16, February.
134. Cross hole seismic test and shear wave velocities properties of Nasiriya Power Plant site (2014) Report No. 18, March.
135. Seismic refraction survey of Zianb Shrine, Karbala (2014), report No.19, April.
136. Thermal conductivity test of Nasiriya Gas Power Station, Nasiriya (2014), Report No. 20, April.
137. GPR Survey of Ministry of electricity building. Al Mansour, Baghdad (2014), report No.28 , July.
138. Cross hole seismic test of Bismaya Combined Power Plant site, Baghdad (2014), Report No. 31, September.
139. Seismic refraction survey of Bismaya Combined Power Plant site, Baghdad (2014), Report No. 30, September.
140. Cross hole seismic test and shear wave velocities properties of Bazyan Combined Power Plant, Slemani, Kurdistan (2014), Report No.34, October.
141. Seismic Refraction survey of Bazyan Combined Power Plant, Slemani, Kurdistan (2014), Report No. 35, October.
142. Thermal conductivity test at W. Qurna-2 ( 2014), Report No. 43, November.
143. Cross hole seismic test of Bismaya Combined Power plant site, Stage II, Baghdad (2014), Report No. 40, November.
144. Seismic Refraction Survey of Bismaya Combined Power Plant site, stage II, Baghdad (2014), Report No.41, November.
145. GPR Survey of Tourist Building, Baghdad (2014), Report No. 52, December.